Send Message

BEXKOM Electronics Co., Ltd. cs1@bexkom.com 86-181-26109795

BEXKOM Electronics Co., Ltd. Company Profile
products
Home > products > Customized Connectors > CNC PEEK Insulator High Density Circular Connector 26 Pin Odm

CNC PEEK Insulator High Density Circular Connector 26 Pin Odm

Product Details

Place of Origin: China

Brand Name: BEXKOM

Certification: UL/CE/ROHS/REACH/ISO9001/ISO13485/MSDS/COC

Model Number: BK-C-XXX

Payment & Shipping Terms

Minimum Order Quantity: 5pcs

Price: USD1.5~2.9/pc

Packaging Details: PE bag + Carton Box

Delivery Time: 7 ~15 days

Payment Terms: T/T, L/C

Supply Ability: 100000pairs/month

Get Best Price
Product Details
Highlight:

26 Pin high density circular connector

,

PEEK high density circular connector

,

odm 26 pin circular connector

Design Fee:
Free
Desgn Term:
1 Weeks
Drawings:
Available
Sample:
Available
Material:
PEEK
Contact Number:
3,5,7
Mate Cycle:
5000
Design Fee:
Free
Desgn Term:
1 Weeks
Drawings:
Available
Sample:
Available
Material:
PEEK
Contact Number:
3,5,7
Mate Cycle:
5000
Product Description

Customizing a product for customers within a 1 to 4-week timeframe involves several key steps to ensure the product meets the desired specifications and quality standards. Here’s a structured approach to achieve this:

Steps to Customize a Product Quickly

  1. Initial Consultation and Requirements Gathering (1-2 Days):

    • Discuss Requirements: Engage with the customer to understand their specific needs, including technical specifications, design preferences, and application requirements.
    • Define Scope: Clearly outline the scope of the customization, including features, dimensions, materials, and any special considerations.
  2. Design and Engineering (3-7 Days):

    • Concept Design: Create initial design concepts based on the gathered requirements. This may include sketches, CAD models, or prototypes.
    • Design Review: Share the designs with the customer for feedback and approval. Make necessary adjustments based on their input.
    • Engineering Validation: Ensure that the design meets all functional, mechanical, and safety requirements. Perform any necessary simulations or tests.
  3. Prototyping (3-7 Days):

    • Prototype Development: Build a prototype based on the approved design. This could be a 3D-printed model, a small-batch production sample, or a fully functional prototype.
    • Testing and Evaluation: Test the prototype to verify that it meets all specifications and performs as expected. Address any issues or adjustments needed.
  4. Production Preparation (2-4 Days):

    • Finalize Design: Incorporate any final changes from the prototype testing phase.
    • Prepare for Production: Set up manufacturing processes, including sourcing materials, setting up molds or tooling, and planning production schedules.
  5. Production and Quality Assurance (5-10 Days):

    • Manufacturing: Begin production of the customized product. Depending on the complexity, this could involve assembly, machining, or other processes.
    • Quality Control: Implement quality control checks throughout the production process to ensure that the final product meets all specifications and standards.
  6. Delivery and Support (1-2 Days):

    • Packaging and Shipping: Prepare the product for shipping, ensuring it is securely packaged to prevent damage during transit.
    • Customer Support: Provide any necessary documentation, support, or training to the customer for the product.

Key Considerations:

  • Clear Communication: Maintain open and clear communication with the customer throughout the process to ensure their requirements are fully understood and met.
  • Rapid Prototyping: Utilize fast prototyping methods, such as 3D printing or CNC machining, to expedite the design verification process.
  • Flexible Manufacturing: Choose manufacturing partners and processes that can accommodate rapid production timelines without sacrificing quality.
  • Efficient Project Management: Implement effective project management practices to keep the project on schedule and address any issues promptly.

Typical Lead Times:

  • Simple Products: For straightforward customizations, a lead time of 1-2 weeks may be sufficient.
  • Complex Products: More complex designs or products may require closer to 3-4 weeks, depending on the complexity and manufacturing requirements.

By following this structured approach, you can efficiently customize a product to meet your customer’s needs within a 1 to 4-week timeframe, ensuring both timely delivery and high-quality results.

 

CNC PEEK Insulator High Density Circular Connector 26 Pin Odm 0